HomeNewsPhotos

Photos

Base track up and running
A contractor uses a front end loader to remove the surface of the track at Dobbins Air Reserve Base, Ga. Sept. 27, 2017. The renovation process lasted about a month as crews worked quickly to have it repaved and restriped. (U.S. Air Force photo/Master Sgt. James Branch)

Download Image: Full Size (0.8 MB)
Tags:
Photo by: Master Sgt. James Branch |  VIRIN: 170927-F-GK272-002.JPG